View PDF

Key Features

  • Excavate and construction of 11 no bases and hardstands.
  • Construction 8 km of access roads and upgrade of 2km of access roads
  • Operation of 2 Borrow Pits as per Quarry Regulations 1999
  • 12 km of Cable Trenching
  • 1 No. Substation Platform
Contract Value :

£4 Million GBP

Contract Type :

IEC – FIDIC – Partial Design and Build

Client :

Iberdrola Engineering and Construction

Start/End:

June 2016– December 2016

Company Involvement:

Roadbridge was appointed as the Contractor for this project in June 2016.

Project Description

Glen App Windfarm is located in an area of coniferous commercial forestry, approximately 4.5 kilometres north-east of Cairnryan, 12 kilometres north-east of Stranraer and approximately 6 kilometres south of Ballantrae, in Scotland. The Roadbridge element of works invovles the construction of a 32.2MW Windfarm with associated Balance of Plant. There are also two register water crossings located within the site footprint that have to be managed during construction.