Key Features

  • 6.7 km of foul and surface water drainage pipework
  • 1.3 km of water main pipework and 0.6 km of rising main
  • Construction of new pumping station and installation of oil interceptors
  • Traffic management and temporary road diversions
  • 2.5 km of road reconstruction
Contract Value :

€5.1 Million

Contract Type :

Traditional IEI remeasurable contract

Client :

Galway County Council

Start/End:

April 2008 - October 2009

Company Involvement:

Roadbridge was appointed as the Main Contractor for the project in March 2008

Project Description

Phase 1 in the village of Barna, Co. Galway and its environs includes for the construction of separate foul and storm water collection systems along with the construction of a new Pumping Station. A short length of rising main will connect to the new rising main from Barna village to the Galway City Main Drainage Scheme. This was constructed as an Advance Contract of the Barna Sewerage Scheme. The separate storm water collection system to be constructed will discharge into the Trusky Stream adjacent to Pier Road via oil interceptors.